The angling facilites before the facelift
The old boat moorings
The main contractor, Martin Donnelly with Matt McAuliffe
The resurfaced carpark being rolled
Resurfaced pathway
The car park and pathway after resurfacing work
The new floating dock arrives by trailer
Sections of the floating dock are launched and assembled
The dock is floated towards its anchorage
The first section is floated into position
Securing the first section
Bringing the second section into position
The newly completed floating dock in position
Removing the old moorings
Clearing the carpark
Strategy meeting
Taking a break
The old facilities
On the new dock
Another break
|